Water treatment system project in Turkmenistan
Angstrom Engineering has installed a water treatment system in Turkmenistan (Ashgabat) for the needs of a complex of industrial greenhouses of soilless cultivation. The capacity of the water purification system is 8 cubic meters per hour.
Capacity of the installed ultra-filtration system + reverse osmosis water purification system is 200 tons / day.